| Document Name | Description | Publication Date |
|---|---|---|
| Exhibition Leaflet | Public information leaflet summarising main points of the August 2007 Public Information Exhibitions. | August 2007 |
| Exhibition Panels | Display panels from the August 2007 Public Information Exhibitions in PDF format. | August 2007 |
| Document Name | Description | Publication Date |
|---|---|---|
| Map of Five Crossing Corridors | Map showing five crossing corridors considered during Forth Replacement Crossing Study. | February 2007 |
| Map of Four Crossing Options | Map of four shortlisted crossing options at culmination of Forth Replacement Crossing Study – one bridge and three tunnels. | February 2007 |
| Map of Tunnel Options | Map of final three tunnel options considered during Forth Replacement Crossing Study. | Febrary 2007 |
| Map of Bridge Option | Map of final bridge option considered during Forth Replacement Crossing Study. | June 2007 |
| Map of Tunnel in Corridor E | Map showing tunnel in Corridor E option which was eliminated from the Forth Replacement Crossing Study. | June 2007 |
| Map of Tunnel C Network Connections | Map showing preliminary corridor and indicative road connections to / from proposed Tunnel in Corridor C. | August 2007 |
| Map of Tunnel D Network Connections | Map showing preliminary corridor and indicative road connections to / from proposed Tunnel in Corridor D. | August 2007 |
| Map of Bridge D Network Connections | Map showing preliminary corridor and indicative road connections to / from proposed Bridge in Corridor D | August 2007 |
| Map of Local Protected Sites | Map showing locations of environmental areas in the Forth Estuary which have protection at a local level. | February 2007 |
| Map of National Protected Sites | Map showing locations of environmental areas in the Forth Estuary which have protection at a national level. | February 2007 |
| Map of Physical Constraints | Map showing constraints in the Forth Estuary which influence or restrict the location of the Forth Replacement Crossing. | February 2007 |
| Document Name | Description | Publication Date |
|---|---|---|
| Public Information Exhibitions – Feedback Report | Report outlining details of the feedback received at the August 2007 Public Information Exhibitions. | November 2007 |
| Comparison Paper on International Bridges and Tunnels (Nov 2007) | Paper highlighting similarities and differences of comparable bridge and tunnel designs from around the world with those proposed as part of the forth Replacement Crossing Study. | November 2007 |
| Immersed Tube Tunnel Report and Appendix Chapters 1 to 5 Appendix A |
Paper explaining the pros and cons surrounding an immersed tube tunnel in Corridor C. | June 2007 |
| Information Note on Wind shielding | Note giving information about the types of wind shielding available and examples of where wind shielding is un use on other bridges. | July 2007 |
| Information Note on HGV restrictions | Note using Transport Model for Scotland (TMfS) to illustrate the likely diversion routes associated with closure of the forth Road Bridge to HGVs in 2013. | July 2007 |
| Information Note on Weekend Delays | Note reporting on the levels of queuing measured at weekends during contra flow operations during the summer of 2007. | June 2007 |
| Document Name | Description | Publication Date |
|---|---|---|
| Report 5 - Final Report | Report Report drawing together the key findings from Reports 1 – 4. | June 2007 |
| Report 5 - Final Report Non-technical summary | Non technical summary of the Final Report, summarising the findings of all the work undertaken during the course of the study. | June 2007 |
| Report 4 - Appraisal of options | Assessment of options using the Scottish Transport Appraisal Guidance (STAG). | June 2007 |
| Report 3 - Option Generation and Sifting | Report identifying options for potential replacement crossing. | February 2007 |
| Report 2 - Gaps and Shortfalls | Report identifying the level of performance expected from the road network and identifying gaps and shortfalls to be addressed. | February 2007 |
| Report 1 - Assessment of transport network | Report assessing the existing and forecast future conditions of the transport network within the corridors of Forth Road and Rail Bridges. | February 2007 |
| Strategic Environmental Assessment Environmental Report | Environmental Report Report on the Strategic Environmental Assessment (SEA) for the Forth Replacement Crossing Study. | September 2007 |
| Strategic Environmental Assessment: Cover Note with Post Adoptation Statement |
As required under the Environmental Assessment (Scotland) Act 2005, this Post Adoption Statement details the environmental considerations taken into account in the Scottish Government’s decision (December 2007) to build a new bridge to the west of the existing Forth Road Bridge. Relevant environmental mitigation comments from this Post Adoption Statement will, along with a detailed Environmental Impact Assessment of the project, inform an Environmental Statement. The Environmental Statement will support the Parliamentary Bill to be promoted by the Scottish Government in late 2009, which will seek authority to construct the new bridge and connecting roads. | December 2008 |
| Document Name | Description | Publication Date |
|---|---|---|
| Artist's Impression Cable Stay Bridge | Early concept design for a possible Cable Stayed Bridge put forward during Forth Replacement Crossing Exhibitions | August 2007 |
| Artist's Impression Suspension Bridge Aug 2007 | Early concept design for a possible Suspension Bridge put forward during Forth Replacement Crossing Exhibitions | August 2007 |
Please view the project contact details if you have an enquiry specific to the Forth Replacement Crossing project.
If you wish to make a more general enquiry, please view the information about Transport Scotland for details.