We're asking visitors for their feedback on our website. The survey takes approximately 5 minutes, Fill in the Survey
Home › Road › Road projects › Trunk road projects › M8 M73 M74 › The Project › M74 Raith Interchange › key statistics

Key statistics

The improvement works at Raith include:

  • Realignment of the A725 over a length of 1.8 km 
  • Provision of an underpass structure for the A725, with one bridge carrying the M74 and two bridges carrying the Raith roundabout
  • Realignment of the Raith roundabout on the south of the M74
  • Provision of a new link road between the B7071 and Raith roundabout with a signalised junction at the A725 eastbound off slip
  • Modifications to the M74 slip roads
  • Provision of new pedestrian/cyclist links including bridges over the Raith roundabout to the north and south of the M74, a new link to the proposed National Cycle Network 74.  and signalised crossing points
  • Provision of an additional lane on the southbound M74 between Bothwell Services and the Raith Junction
  • Demolition of the existing Bothwell Park Road access bridge over the M74, to the north of Raith junction, and construction of a new realigned bridge at this location
  • New private access road through Strathclyde Country Park
  • Provision of a sustainable urban drainage system and flood water storage areas
  • Environmental mitigation and enhancement works.
     
Your rating: None Average: 5 (1 vote)
Visit Us On: Follow us on Flickr Follow us on Twitter Watch and subscribe to our YouTube channel


Trunk Road Projects

Looking for further details of motorway and trunk road improvement projects across Scotland?


Or view all trunk road projects »